ISS Daily Summary Report – 7/25/2017

Fluid Shifts:  A crew member completed the first of two days of Chibis operations in the Russian Segment for the Fluid Shifts investigation. They donned the Lower Body Negative Pressure (LBNP/Chibis) device while the operator, with ground support in Moscow, assisted in taking measurements for Cerebral and Cochlear Fluid Pressure (CCFP) and performed a Distortion Product Otoacoustic Emission (DPOAE) test, Optical Coherence Tomography (OCT), and a Tonometry examination. The Fluid Shifts experiment investigates the causes for severe and lasting physical changes to astronaut’s eyes.  Because the headward fluid shift is a hypothesized contributor to these changes, reversing this fluid shift with a lower body negative pressure device is being evaluated as a possible intervention. Results from this study may help to develop preventative measures against lasting changes in vision and to prevention of eye damage.

Rodent Research-5 (RR-5) Systemic Therapy of NELL-1 for Osteoporosis: The crew cleaned and restocked the Animal Habitats in support of the RR-5 investigation.  Because spaceflight has significant and rapid effects on the musculoskeletal system it is important to investigate targeted therapies that could ameliorate some of the detrimental effects of spaceflight. The NELL-1 drug being studied in the RR-5 investigation has the potential to slow or reverse bone loss during spaceflight.

Lighting Effects: The crew set up and configured the light meter hardware and took readings in the Cupola and the Columbus. The Lighting Effects investigation hopes to better quantify and qualify how lighting can effect habitability of spacecraft. The light bulbs on the ISS are being replaced with a new system designed for improved crew health and wellness. The Lighting Effects investigation studies the impact of the change from fluorescent light bulbs to solid-state light-emitting diodes (LEDs) with adjustable intensity and color and aims to determine if the new lights can improve crew circadian rhythms, sleep, and cognitive performance. Results from this investigation also have implications for people on Earth who use electric lights. 

Crew Medical Officer (CMO) Training: FE-2 completed this training which is an onboard refresher for long duration missions. Medical procedures and hardware were reviewed to ensure continuing basic knowledge of the Health Maintenance System.

Today’s Planned Activities
All activities were completed unless otherwise noted.

  • Fluid Shifts Experiment
  • On MCC GO Regeneration of Micropurification Unit (БМП) Ф2 Cartridge (start)
  • Combustion Integrated Rack Alignment Guide Install
  • Virus Definition File Update on Auxiliary Computer System (ВКС) Laptops
  • RADIOSKAF. Disconnecting of ТПУ 120 nanosatellite from charger and connecting Tanysha-SWSU-1 and Tanysha-SWSU-2
  • Service Module Data Collection – Operator
  • Verification of ИП-1 Flow Sensor Position
  • Vacuum Cleaning of ВД1 and ВД2 air ducts in DC1
  • METEOR Hardware Check
  • JEM Wireless Instrumentation System Environmental Monitor Remote Sensor Unit Battery R&R
  • Microbial Tracking-2 Saliva Setup
  • Rodent Research Node 2 Camcorder Video Setup
  • Lighting Effects Light Meter Readings Alternate 1
  • Rodent Research Habitat 3 & 4 Restock
  • Rodent Research Access Unit Clean
  • SPLANH. Preparation for experiment
  • RADIOSKAF. Monitoring Tanysha-SWSU-1 and Tanysha-SWSU-2 nanosatellites charge level status.  Photo/Video Ops
  • Antibody Conjugates MELFI Sample Retrieve 

Completed Task List Items

  • None

Ground Activities
All activities were completed unless otherwise noted.

  • Fluid Shifts support
  • Rodent Research Support
  • SSRMS walkoff to MBS3/SPDM unstow

Three-Day Look Ahead:

  • Wednesday, 07/26: T2 monthly inspection, ELF sample swap, ADC B cell fixation
  • Thursday, 07/27: Spring VO2 ops, Capillary Structures, CBEF ops
  • Friday, 07/28: 51S Launch, RR gather/procedure review

QUICK ISS Status – Environmental Control Group:

  Component

Status

Elektron

Off

Vozdukh

Manual

[СКВ] 1 – SM Air Conditioner System (“SKV1”)

Off          

[СКВ] 2 – SM Air Conditioner System (“SKV2”)

On

Carbon Dioxide Removal Assembly (CDRA) Lab

Operate

Carbon Dioxide Removal Assembly (CDRA) Node 3

Standby

Major Constituent Analyzer (MCA) Lab

Idle

Major Constituent Analyzer (MCA) Node 3

Operate

Oxygen Generation Assembly (OGA)

Standby

Urine Processing Assembly (UPA)

Standby

Trace Contaminant Control System (TCCS) Lab

Full up

Trace Contaminant Control System (TCCS) Node 3

Off