Home & Garden

Lane, Exit Closures This Week Near the Tappan Zee Bridge

Storms prevented the work last week.

Construction work July 6-8 will close multiple lanes of the New York State Thruway on either side of the Hudson River.

Exit 10, in Nyack, will also be affected.

The work is part of the construction of the new bridge. Here are the details from the New NY Bridge website:

Find out what's happening in Nanuetwith free, real-time updates from Patch.

During the overnight of Monday, July 6, lane restriping operations will require triple-lane closures of the northbound New York State Thruway (I-87/I-287) from exit 9 (Tarrytown - Sleepy Hollow - US Route 9) to exit 11 (Nyack - South Nyack - US Route 9W). Specific lane closure times are listed in the chart.

At least one lane will remain open at all times, except during periodic traffic stops lasting up to 10 minutes of all four lanes of the northbound Thruway near exit 11 (Nyack – South Nyack – US Route 9W). To ensure the public’s safety, the New York State Police will stop and hold all traffic approaching the area immediately before the traffic stops go into effect. Motorists will be permitted to enter the Thruway from all ramps during the traffic stops.

Find out what's happening in Nanuetwith free, real-time updates from Patch.

Additionally the exit 10 (Nyack – South Nyack – US Route 9W) off-ramp from the northbound Thruway will also be closed during the overnight of Monday, July 6. Drivers will be directed to use exit 11 (Nyack – South Nyack – US Route 9W).

During the overnight of Tuesday, July 7, construction operations will require overnight double-lane closures of the northbound Thruway from exit 9 (Tarrytown - Sleepy Hollow - US Route 9) to exit 11 (Nyack - South Nyack - US Route 9W). Specific lane closure times are listed in the chart.

At least one lane will remain open at all times, except during periodic traffic stops lasting up to 10 minutes of all four lanes of the northbound Thruway near exit 11 (Nyack – South Nyack – US Route 9W.

During the overnights of Wednesday, July 8 through Friday, July 10, construction operations will require triple-lane closures of the southbound Thruway in the area of exit 10 (Nyack – South Nyack – US Route 9W). Specific lane closure times are listed in the chart.

Additionally the exit 10 (Nyack – South Nyack – US Route 9W) on-ramp to the southbound Thruway will be closed from 8 p.m. to 5 a.m. during the overnights of Tuesday, July 7 and Wednesday, July 8. Drivers will be directed to use the on-ramp from Route 59 in Nyack, as shown in the graphic.

MAP: NYTA/the New NY Bridge


Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.

We’ve removed the ability to reply as we work to make improvements. Learn more here