BrownhillsBob's #365daysofbiking

February 28th - Another grey, dull day, with a worsening wind. I had stuff to do in Walsall Wood and headed up the canal to get there. Between Cathshill Junction and Walsall Wood Bridge, work has been ongoing since summer on the eastern embankment. First, it was strengthened with sectional piling at the Black Cock Bridge, and the level raised; now soil has been added to some thickness along much of the stretch, presumably to provide better security agains overtopping and to counteract weather erosion. 

I note that on the bend that was piled, staves have been driven into the bank, and reed beds planted behind, presumably to create a natural buffer against erosion in a particularly vulnerable spot.

Wonder if they’ll get round to fixing the brickwork and voids on the pedestrian side of the canal anytime soon?

  1. brownhillsbob posted this